TCP/DHT Mobile Work Shop

FOB Reference Price:Get Latest Price
1 Unit/Units (Min. Order)
Supply Ability:
15 Unit/Units per Month
Port:
Suez
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Egypt
Brand Name:
R.S.E
Model Number:
RSE-000000-000
Type:
Steel Container
Scale:
Heavy Duty
Capacity:
37.5 m3 : 75m3
20' X 8' , 30' X 8", 40' X 8':
ISO Container
6 X 3 m, 9 X 3 m, 12 X 3 m:
New Container
Packaging & Delivery
Delivery Time
2-3 weeks

Specifications

TCP/DHT Container has one steel work bench, One Tool cabinet. There are six (6) units of drill pipe racks, One G-Open Side Vise

Work Shop area accessories:

TCP/DHT Container has one steel work bench with drawers and one (1) cabinet for tools storage. One (1) unit 6” utility bench vise rigid attached onto work bench.

Also there are six (6) units of drill pipe racks on one side of the container and two (2) pipe racks on the other side of the container. The drill pipe rack has (2) rows at the bottom and can stack one rows descending.

Arm & Pipe vise

One (1) set of standard open side pipe vise is rugged screw-type. Vise that hold tubing and drill pipe up to 8” size with a rotating arm made of I-beam.

Chain Block & Trolleys for Internal Lifting arrangement

Two (2) units of transverse and axial roller trolley & one (1) unit of 1 ton manual chain block with plain trolley arrangement fitted to I-beam lifting arrangement.

Insulation:

TCP/DHT Container insulated by Undesignated Rock Wool Mattresses made from non-combustible Rock Mineral Wool. 

Rear workshop area

The rear workshop area is partitioned from the office area. Along the partition an equipment washing facility will be fitted with a steel sink, under table mounted waste water and diesel tank that can be filled/drained from the exterior of the workshop container. On the left side an air compressor shall be mounted and next to it a Karcher high pressure cleaner. On the right side a gas bottle rack will be fitted for secure storage and transport up to 2 std. Nitrogen bottles. The high pressure cleaner will have an external water supply connection and outlets in the rear workshop area, the front workshop area and in addition 30 meters of high pressure hose supplied on a reel. Air outlets for the compressor are available in the rear workshop area, the front workshop and in addition a reel will be supplied with 30meters of hose

Office Area:

A partition will be installed to segregate the workshop area from the office area. The interior is insulated with 50mm Sandwich panel. On the left hand side a ready box made of steel is fitted and secured in open and closed position. On the right hand side a desk is mounted with 28mm plywood desktop and three drawers that can be secured during transport. Temperature will be controlled by means of a wall mounted split A/C unit with a capacity of 1.5 Hp.

And more...

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like